MWAA Set To Correct ADA Access, VDOT Misses the Point
In case you haven’t heard the latest in the saga that is the construction of the Silver Line metro, MWAA and Bechtel will be replacing several of the one year old sidewalk curb ramps that were installed as part of the construction of the Silver Line. These are entirely located along Route 123 and Route […]